[1] SONG Mingtao, ZHAN Wenlong, WEI Baowen, et al. Nuclear Physics Review, 2001, 18(2):116.(in Chinese)(宋明涛,詹文龙,魏宝文,等.原子核物理评论, 2007, 18(2):116.)
[2] XIAO Guoqing, ZHANG Hong, LI Qiang, et al. Nuclear Physics Review, 2007, 24(2):85.(in Chinese)(肖国青,张红,李强,等.原子核物理评论, 2007, 24(2):85.)
[3] CERFF K, HAAS D, JAKEL D. et al. Setup and Diagnostics of Motion Control at Anka Beam Lines[C]//Proceedings of PCaPAC2014, Karlsruhe, Germany, 2014:198.
[4] WITTENBURG K. Beam Size Measurements Using Wire Scanners[C]//Topical Workshop on Emittance Measurements for Light Sources and FELs, Barcelona, Spain, January 29-30, 2018.
[5] LI Min. The Design and Implementation of Front-end Control System of Beam Diagnostics for Heavy-ion Accelerator[D]. Lanzhou:Graduate University of the Chinese Academy of Sciences (IMP)2015:91.(in Chinese)(李敏. HIMM束流诊断前端控制系统的设计与实现[D].兰州:中国科学院研究生院(近代物理研究所)2015:91.)
[6] BeckHoff. Embedded PC CX[EB/OL].[2019-05-15]. http://www.beckhoff.com.cn/. 37(12):.
[7] MIN Xiaoshuang, YANG Xin. Information technology and Network security, 2018, 37(12):71.(in Chinese)(闵晓霜,杨鑫.信息技术与网络安全, 2018, 37(12):71.)